Shipping Furniture from Lombok to Sumbawa: What to Expect

Jul 24
2 min read

Updated: Oct 14


Solid teak outdoor bench with natural weathered finish

If you're furnishing a villa, guesthouse or surf camp on Sumbawa with pieces from our showroom in Kuta, Lombok, the short version is this: shipping furniture from Lombok to Sumbawa runs by truck and ferry, usually takes a few days once your order is ready, and is quoted per project. Production comes first: standard pieces take 1 to 2 months, custom orders may take longer.

Here's what actually happens between placing an order and having it on site.


Delivery Within Lombok


If your project is on Lombok itself, delivery is the simplest case: we deliver directly, with no third-party freight involved. In the Kuta area, on-site assembly is included.


Shipping Furniture from Lombok to Sumbawa


For projects on Sumbawa, we arrange delivery from Lombok as part of your order. In practice this means:

Furniture is packed and moved by truck and ferry from the east coast of Lombok to West Sumbawa, not flown

Delivery cost and timing depend on where on Sumbawa your property is, so we quote them together with your order

Larger orders (multiple pieces for a villa or hotel project) are typically consolidated into a single shipment rather than sent piece by piece

For destinations further out across Indonesia, delivery is available on request, so timelines and cost are quoted per project.


Shipping Internationally


If you're furnishing a property outside Indonesia, international shipping is available on request. Get in touch with your destination and we'll talk through the options for your project.


Lead Times: How Long Before Your Order Ships


Production time is usually the bigger factor than the shipping leg itself:

Standard pieces: 1 to 2 months from confirmation

Custom orders may take longer, depending on material availability and production load

Once production is complete, delivery to Sumbawa is a matter of days, not weeks

If you're planning a villa opening or a new season, work backward from that date and build in the production time first. The shipping leg itself is the fast part.


Assembly and Installation on Delivery


In the Kuta area, delivery with on-site assembly is included as standard. For deliveries elsewhere in Lombok, to Sumbawa or other locations, assembly and installation can be discussed as part of larger projects. Raise it when you request your quote so it's factored into the timeline from the start.


Planning Your Shipment: What Helps


A few things that make delivery to Sumbawa smoother:

Confirm your delivery address and access details early (access roads, gate width, delivery windows) so nothing holds up the truck on arrival day

Give your realistic opening or move-in date upfront, so we can plan production and shipping backward from it rather than guessing

If you're ordering multiple pieces, ask about consolidating into one shipment rather than several; it's usually more efficient for both timeline and cost


Furnishing a Property on Sumbawa


Our pieces are handcrafted in workshops across Indonesia and can be seen in person at our showroom in Kuta, Lombok, from late October 2026. If you're planning a project on Sumbawa and want a realistic timeline before you commit to an opening date, get in touch with your project details, or browse the full catalogue to start putting together what you need.

Browse matching pieces in our catalogue: Beamz Console Table, Round Natural Storage Mirror and Thora Coffee Table.

 
 
 